Map Recent Data Charts Control Radar Alarms Notes Maintenance Contact ☰

To carry out maintenance, use the Android app.

This page is for reading and downloading what has already been recorded. The visit itself is done on a phone at the site, offline, and uploaded on the trip or afterwards (depending on cell service).

Download the app

‹ all sites

Bould Cres

2026-09-06 10:25

Group
CoG
Site
Bould Cres
Data file
Bould_Cres.csv
Started
2026-09-06 10:25:32
Ended
2026-09-06 10:27:16
Times
phone local time UTC-04:00
Rows
28

Photographs (3)

Bould_Cres_20260906_1025_dtec_102607.jpg
Bould_Cres_20260906_1025_dtec_102607.jpg
Bould_Cres_20260906_1025_radar_102654.jpg
Bould_Cres_20260906_1025_radar_102654.jpg
Bould_Cres_20260906_1025_wide_102538.jpg
Bould_Cres_20260906_1025_wide_102538.jpg

The record

TimeEventItemValueUnit PointStandardNote
10:25:32 visit started Bould Cres CoG
10:25:32 method chosen DTEC — EC clean
10:25:32 job added by hand DTEC — EC not in this site's data
10:25:32 method chosen Radar — depth distance
10:25:32 method chosen Radar — velocity spot
10:25:32 method chosen Battery maintenance swap
10:25:33 site check Radar — no rainfall ok
10:25:34 site check Access — safe and stable ok
10:25:34 site check No damage in work area ok
10:25:38 photograph, wide photos/Bould_Cres_20260906_1025_wide_102538.jpg 43.5366 -80.2553 gps
10:26:07 photograph, sensor photos/Bould_Cres_20260906_1025_dtec_102607.jpg no gps
10:26:10 dtec probe Manual depth before removal invert to water surface 22 mm 1 22 before the clean
10:26:28 dtec probe Probe lifted out of the water done
10:26:30 ec step Cell rinsed with DI water done
10:26:31 ec step Electrodes wiped done
10:26:31 dtec probe Probe returned to the water at the same height done
10:26:34 dtec probe Manual depth after replacing invert to water surface 22 mm 1 22 after the clean
10:26:54 photograph, sensor photos/Bould_Cres_20260906_1025_radar_102654.jpg no gps
10:26:56 depth-radar step Distance mount face to water surface 2500 mm 1 2500
10:26:58 depth-radar step Radar angle from horizontal 55 ° 1 2500
10:27:01 depth-radar step Sensor-reported distance at that moment 2555 mm 1 2500
10:27:03 depth-radar step Mount and bracket secure done 1 2500
10:27:05 velocity step Manual surface velocity 22 mm/s 1 22
10:27:07 velocity step Sensor velocity at that moment 022 mm/s 1 22
10:27:10 battery step Batteries changed done
10:27:10 batteries changed battery pack changed
10:27:15 taken out of order ending the visit skipped the final check has not been run; closing close-ups for 2 probes; the closing wide shot
10:27:16 visit ended Bould Cres